
155 Edward St
Brisbane CBD — February 2026
Allied Commercial successfully delivered a full roof replacement within the tightly controlled environment of Brisbane's CBD, where logistical constraints and public-interface considerations required a carefully engineered delivery strategy. Operating within a live commercial precinct, the project demanded detailed coordination with local authorities, neighbouring properties, and traffic management providers. Material handling was executed via crane lifts during approved time windows, with deliveries programmed to accommodate restricted access and minimise impacts on surrounding streets and pedestrian pathways. The existing roofing system was systematically removed, with all waste managed in accordance with environmental compliance standards. Prior to installation of the new roofing system, a comprehensive structural assessment of the roof substrate was undertaken to verify integrity and identify any required remedial works. The replacement system was installed in line with current Australian Standards and manufacturer specifications to ensure long-term performance, weather resistance, and asset durability.
Scope of Works
Challenges
- Complex CBD delivery logistics with restricted vehicle access
- Coordination with local council for crane permits and road closures
- Minimising disruption to neighbouring commercial tenants
- Weather exposure management during roof replacement
Outcomes
- Completed on time with zero safety incidents
- Structural assessment identified and resolved substrate issues
- Full Australian Standards compliance certification
- Minimal disruption to building tenants and CBD operations
Property Details
Multi-tenant commercial office
Project Team
Have a Similar Project?
Contact our team for a no-obligation quote or site inspection.
Get a Quote1300 730 424
